Bathroom Renovation — Butte, MT

This Butte bathroom went from a tub and pedestal sink to a walk-in shower and a new vanity. During the renovation, the wall around the glass-block window was opened; the room also had drywall work and gray paint.

Pulling the toilet revealed a leak and mold. The floor was removed to reach the repair. A plumber replaced the whole drain pipe and flange. The pipe sat low, and three layers of subfloor had been built around it.

LifeProof LVP replaced the original linoleum. New 1x4 pine trim was stained mahogany. A mirrored medicine cabinet and new vanity light finished the sink area.

Next
Next

Kitchen Floor and Trim — Butte